Zone 3

  • Church has no drinking water and the bathroom needs a plumber. Need an electrician to update wiring. 4 people for wood splitting, painting, raised bed gardens and a greenhouse. Moving large rocks
  • Parsonage needs front arctic entry rebuilt. Porches need rebuilt. Future parsonage needs reroofed. Parsonage and shop both need paint.
  • Repair ministry family home: painting,
    flooring, leveling foundation, construct deck with ramp. Another Conex for ministry bike shop and small appliance repair and lumber to level.
  • Construct church parsonage from a kit.

COMPLETED: 

  • Repaired & assisted with vehicle maintenance and church building remodel
  • Repaired church parsonage for pastor’s family
  • Constructed/Fabricated Conex bike shop for ministry outreach